OPTIMAL COST MANAGEMENT METHOD FOR CONSTRUCTION PROJECTS USING BELLMAN ALGORITHM
Main Article Content
Abstract
This article presents the implementation of the Bellman algorithm on the mathematical software platform Mathcad Prime for construction project management. The content includes an introduction to the Bellman algorithm and related theoretical foundations, and presents the Bellman algorithms integrated and applied in Mathcad Prime software. The objective of this paper is to provide an optimal cost management approach for construction projects based on the Bellman algorithm. The research findings contribute to improving efficiency and productivity in construction project management, optimizing management costs, while also meeting the demand for reference materials among students and construction project management engineers.
Article Details
Section
Construction